Gainesville Logo
 
File #: 211479.    Version: 1 Name:
Type: Staff Recommendation Status: To Be Introduced
File created: 8/5/2022 In control: Utility Advisory Board
On agenda: 8/11/2022 Final action:
Title: Distributed Solar Generation Intake to GRU System (B)
Attachments: 1. 211479_Distributed_Solar_Generation_Intake_in_GRU_System_Memo_20220811
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Distributed Solar Generation Intake to GRU System (B)

 

Explanation

In mid-2021, members of the building community raised questions to the City Commission about GRU Energy Delivery's policy of not allowing solar systems of more than 2 MW to interconnect to GRU's grid.  In response to these questions, GRU staff contracted with an independent consultant to do a distributed solar penetration study.  The results of the study revealed that some circuits could not accept more than 2 MW, while other circuits could accept more than 2 MW, which confirmed that GRU's policy is sound.

 

Staff has drafted a memo to the City Commission to explain the results of the study and present the memo now to the UAB for their feedback before staff takes it to the City Commission.

 

Fiscal Note

None.

 

Recommendation:

The UAB review staff's memo and provide feedback for staff's consideration.

 




© 2014 City of Gainesville, Florida. All right reserved.

CONTACT US
City Departments
Online Contact
200 East University Ave.
Gainesville, FL 32601
352-334-5000