File #: 080678.    Version: 0 Name: Resolution Approving the Conditional Final Plat Weschester Cluster Subdivision Phase IV (B)
Type: Resolution Status: To Be Introduced
File created: 1/15/2009 In control: Development Review Board
On agenda: Final action: 1/15/2009
Title: Resolution Approving the Conditional Final Plat Weschester Cluster Subdivision Phase IV (B) Conditional final plat review for 139 lots at Weschester Cluster Subdivision Phase IV (formerly Krystle Pines Cluster Subdivision), located in the 8200 block of NW 43rd Street (west side). Petition 122SUB-02DB.
Attachments: 1. 080678_resolution_20090115.pdf, 2. 080678_final plat_20090115.pdf, 3. 080678_resolution_20090115.pdf
Title
Resolution Approving the Conditional Final Plat Weschester Cluster Subdivision Phase IV (B)
 
Conditional final plat review for 139 lots at Weschester Cluster Subdivision Phase IV (formerly Krystle Pines Cluster Subdivision), located in the 8200 block of NW 43rd Street (west side).  Petition 122SUB-02DB.
 
Explanation
The Development Review Board considered a request to approve a design plat of the Krystle Pines Cluster Subdivision (currently referred to as Weschester Cluster Subdivision) at a public hearing held January 9, 2003.  By a vote of 2 to 1, the Development Review Board approved Petition 122SUB-02DB, with staff conditions.  On February 10, 2003 the City Commission approved the design plat and on January 26, 2004, the City Commission granted a six-month extension of time of the design plat approval to July 26, 2004 in accordance with Section 30-183(J)(2) of the Code of Ordinances.  The commission allowed subsequent phases to be filed at six-month intervals.  The design plat included 418 dwelling units on 215 acres, at a density of 1.9 dwelling units per acre to be completed in seven phases.  The phasing schedule for implementation of the plat was later reconfigured to four phases; this being the last of the four phases.
 
The Weschester Cluster Subdivision Phase IV Conditional Final Plat includes construction of new streets representing the extension of the following streets currently existing in Phase I: NW 51st Drive, NW 51st Street, NW 52nd Street, NW 53rd Street, NW 53rd Terrace, NW 54th Street and NW 54th Terrace.  Two east-west streets NW 82nd Place and NW 82nd Avenue will be constructed.  The Weschester Cluster Subdivision Phase IV Conditional Final Plat contains 34.29 acres, including 3.04 acres of wetlands and wetland buffers with a 50-foot wetland buffer surrounding all wetland areas.  No portion of any platted lot includes wetlands or wetland buffer.  The Phase IV Conditional Final plat contains only a small portion of the total cluster open space shown on the design plat for all phases of the Weschester Cluster Subdivision; the majority of the cluster open space is included in the Phase I portion of the subdivision. Additional cluster open space in the amount of 2.97 acres is included in the Phase III portion of the plat.  
 
The conditional final plat is not recorded but is retained by the Clerk of the Commission until all infrastructure is completed and ready for acceptance by the city per Sec. 30-186(e). Additionally, all other phases of the Weschester Cluster Subdivision have been finalized and recorded.  
 
A Certificate of Final Concurrency has been issued for all phases in accordance with a development agreement for concurrency between the subdivider and the City.
 
Fiscal note
None
 
Recommendation
Planning Staff to City Commission--The City Commission adopt the following resolution:  A Resolution approving the conditional final plat of "Weschester Cluster Subdivision Phase IV, bounded on the east, south and west by Phase I and located generally on the north side of NW 82nd Boulevard between NW 54th Terrace on the west and the west boundary of Phase I closest to NW 51st Drive; and providing an immediate effective date.
 