Gainesville Logo
 
File #: 050379    Version: 0 Name: Purchase Order for Steel Pipe (B)
Type: Staff Recommendation Status: Passed
File created: 9/12/2005 In control: General Manager for Utilities
On agenda: Final action: 9/12/2005
Title: Purchase Order for Steel Pipe (B)
Attachments: 1. 050379_200509121300.pdf
title
Purchase Order for Steel Pipe (B)
explanation
On May 23, 2005, the City Commission approved the purchase and installation of a natural gas metering and regulating station at the Deerhaven Generating Plant.  This new installation is needed to expand the availability of natural gas service and to increase the operational flexibility and reliability of the natural gas distribution system.  The Grade B Fusion Bond Coated Steel Pipe is necessary to connect the metering and regulating station to the main gas line off of Highway 441.  This pipe is a non-standard material and is not stocked in GRU's warehouses.  
 
Purchasing solicited requests for written quotations from three prospective bidders.  All three bidders responded with McJunkin Corporation providing the lowest bid.  A Bid Tabulation is attached for your information.  
recommendation
The City Commission authorize the issuance of a purchase order to McJunkin Corporation for the purchase and delivery of 3840' of Grade B Fusion Bond Coated Steel Pipe in an amount not to exceed $51,820.00.  
fiscal note
Funds are available in the FY 2005 Energy Delivery Budget.  
drafter
Prepared by: Dave Beaulieu, Assistant General Manager for Energy Delivery
Submitted by: Michael L. Kurtz, General Manager
 
 



© 2014 City of Gainesville, Florida. All right reserved.

CONTACT US
City Departments
Online Contact
200 East University Ave.
Gainesville, FL 32601
352-334-5000