Gainesville Logo
 
File #: 050380    Version: 0 Name: Purchase Order for Cured-In-Place Pipe Installation Gravity Sanitary Sewer Rehabilitation (B)
Type: Staff Recommendation Status: Passed
File created: 9/12/2005 In control: General Manager for Utilities
On agenda: Final action: 9/12/2005
Title: Purchase Order for Cured-In-Place Pipe Installation Gravity Sanitary Sewer Rehabilitation (B)
Attachments: 1. 050380_200509121300.pdf
Title
Purchase Order for Cured-In-Place Pipe Installation Gravity Sanitary Sewer Rehabilitation (B)
Explanation
The GRU Wastewater Collection Department performs television inspection of GRU's gravity sanitary sewer system to identify areas that may require rehabilitation. The inspection of the existing vitrified clay pipe (VCP) gravity sanitary sewers identified six different locations within GRU's sanitary sewer service area which require rehabilitation, including approximately 327 feet of 10-inch and 2677 feet of 8-inch diameter gravity sanitary sewer. Without rehabilitation, the gravity sanitary sewers are subject to internal corrosion, breaks, and groundwater infiltration.

Due to the depth, location, and environmental considerations associated with rehabilitating these gravity sanitary sewers, it is not economically feasible to replace the gravity sanitary sewer using conventional open trench techniques. A proven and cost effective alternative is a trenchless technology which rehabilitates the gravity sanitary sewer with a cured-in-place resin impregnated lining. The lining provides renewed structural integrity to the gravity sanitary sewer, thereby eliminating internal corrosion and preventing infiltration of groundwater into the gravity sanitary sewer. Groundwater infiltration can cause the gravity sanitary sewer to exceed its capacity which can lead to failure of the system. In addition, infiltration significantly reduces the capacity of GRU's wastewater collection system and waste water treatment plants and increases pumping and treatment costs.

This project is part of an on-going program to reduce infiltration and inflow within the wastewater collection system and demonstrates GRU's proactive approach to spill prevention. In addition to lining the gravity sanitary sewer, the Contractor will televise the gravity sanitary sewer, perform heavy cleaning of the gravity sanitary sewer and install temporary wastewater bypass pumps and above gro...