Gainesville Logo
 
File #: 000399    Version: 0 Name: Villas on the Lake Subdivision (B)
Type: Resolution Status: Passed
File created: 9/11/2000 In control: City Manager
On agenda: Final action: 9/11/2000
Title: Petition 006SUB-00 DB, Rory P. Causseaux, P.E., agent for Emmer Development Corporation. Final plat approval of Villas On The Lake Subdivision, Twelve (12) lots on 4.36 acres more or less, having a density of 2.75 dwelling units per acre. Located in the vicinity of the Northwest 49th Avenue and Northwest 24th Boulevard, west side of street. Zoned: PD-5du/ac (B)
Attachments: 1. 000399_Resolution Final plat approval of Villas On The Lak_20000911, 2. 000399_Resolution_20000911
Title
Petition 006SUB-00 DB, Rory P. Causseaux, P.E., agent for Emmer Development Corporation. Final plat approval of Villas On The Lake Subdivision, Twelve (12) lots on 4.36 acres more or less, having a density of 2.75 dwelling units per acre. Located in the vicinity of the Northwest 49th Avenue and Northwest 24th Boulevard, west side of street. Zoned: PD-5du/ac (B)

Explanation
The City Plan Board considered a request to approve a design plat of Villas On The Lake Subdivision, at a public hearing held February 17, 2000. By a vote of 6-0, the Plan Board approved Petition 006SUB-00 DB with staff conditions. On March 13, 2000, the City Commission approved the design plat with conditions.

As part of the Planned Development (PD) rezoning amendment (Petition 005PDA-00PB), approved July 10, 2000, the petitioner is proposing to implement the PD amendment with this design plat of 12 single-family detached homes on 12 lots on approximately 4.36 acres, with a density of 2.75 dwelling units per acre. The petitioner is proposing a 24-foot wide, private, curb and gutter street (Northwest 49th Avenue) approximately 550 feet in length to serve the subdivision. The paved street has an L-shaped turn-around at its terminus that connects with a stabilized grass emergency access/public utilities right-of-way that connects with the "Rainbows" subdivision located to the southwest. The petitioner will be eliminating an open stormwater drainage ditch that bisects the subdivision site in a north-south direction. The ditch will be replaced with a piped underground stormwater system that will help drain overflow from a wetlands located in the western portion of the subdivision and lands to the north. The overflow from the wetlands and other stormwater is to be piped to a new stormwater management facility located south of the new homes that will then pop-off to the "lake" further to the south. In addition, the petitioner will be relocating an existing sanitary sew...

Click here for full text



© 2014 City of Gainesville, Florida. All right reserved.

CONTACT US
City Departments
Online Contact
200 East University Ave.
Gainesville, FL 32601
352-334-5000