Gainesville Logo
 
File #: 000353    Version: 0 Name: Ash Removal From Deerhaven Ash Landfill (B)
Type: Staff Recommendation Status: Passed
File created: 8/28/2000 In control: General Manager for Utilities
On agenda: Final action: 8/28/2000
Title: Ash Removal From Deerhaven Ash Landfill (B)
Attachments: 1. 000353_RFP No. 2000-118_20000828
Title
Ash Removal From Deerhaven Ash Landfill (B)
Explanation
As coal is burned in Deerhaven Unit 2, some ash is left over. A small percentage of the ash is heavy enough to fall to the bottom of the boiler and is collected as bottom ash. The bottom ash is collected and stored onsite in the ash landfill. The lighter ash is carried by the exhaust gasses through the furnace and collected in the electrostatic precipitator as fly ash. The fly ash is then conveyed to a storage silo and can be loaded into trucks and hauled to Deerhaven's onsite landfill or to offsite facilities where it is used in the manufacturing of cement

Currently, almost all of the fly ash produced at Deerhaven is sold under contract to Central Power and Lime and used in their cement kiln near Brooksville Florida. Because of this, we are putting almost no new fly ash into the Deerhaven landfill. However, demand for fly ash cycles for various reasons and in the past much of the fly ash produced at Deerhaven was stored in the landfill. The landfill contains approximately 400,000 tons of ash accumulated over the 18 years of Deerhaven Unit 2 operation.

Recently, staff has been approached by various cement manufacturing companies interested in removing the ash stored in the landfill. Staff believes this would be a benefit because a waste product will be recycled into a useful product, landfill space at Deerhaven will be freed up postponing the need to add to the landfill capacity at Deerhaven, and we would be removing a potential liability from the environment.

In response to these inquiries, staff issued a request for proposals to firms interested in removing the ash from the landfill. Only one response was received, but the response meets all the technical and bid specifications. Therefore, staff recommends negotiation and execution of a contract with Florida Rock Industries, Inc.
Recommendations
Authorize the General Manager or his designee to negotiate and execute a contract for ...