File #: 991291    Version: 0 Name: Construction of Rocky Point Power Delivery System (PDS) (B)
Type: Discussion Item Status: Passed
File created: 4/10/2000 In control: General Manager for Utilities
On agenda: Final action: 4/10/2000
Title: Construction of Rocky Point Power Delivery System (PDS) (B)
Attachments: 1. 991291_Invitation to Bid 200-073_20000410
Title
Construction of Rocky Point Power Delivery System (PDS) (B)
Explanation
Due to rapid growth and development in southwest Gainesville, there has been an increased demand placed on the electric system. In response to this and to provide greater reliability to the customers in this area, Utility staff recommended and the Commission approved the purchase of a 2.75-acre parcel for construction of the PDS in the summer of 1998. A PDS is used to deliver power from high voltage transmission lines to local distribution customers. Substations of this type are small, less obtrusive and can be sited very near the customers they serve. You may recall, the site was chosen, in part, to eliminate the need to construct another costly and aesthetically unattractive overhead transmission line corridor. Major elements of the PDS project will include a power transformer, an electrical equipment enclosure to house power circuit breakers and associated equipment.

Construction will occur on an undeveloped wooded parcel located at 4012 SW 27th Street. The site features large 125-foot setbacks to the north, west and east providing ample buffering between nearby residences and the PDS. Only trees within and adjacent to the equipment yard will be removed. The equipment yard will measure 120 feet by 85 feet. Construction plans include a masonry wall around the perimeter of the equipment yard. McClain Design Group prepared a landscape plan for the project. Distribution circuits will exit underground further minimizing the stations' visual impact.

Energy Delivery Engineering and Utilities Purchasing identified ten suppliers interested in the PDS engineering, procurement and construction (EPC) "turnkey" project. During a pre-qualification phase each was asked to submit their qualifications and relevant, successful experience. GRU determined that six firms met the established criteria and were considered to be pre-qualified.

The six pre-qualified suppliers were ...