Gainesville Logo
 
File #: 002560    Version: Name: Petition 26WSU-02 CC. (Quasi-Judicial). Request by Cinque Holdings, Inc. for a wellfield protection special use permit with associated development plan review for construction of a building for automotive repair located at 3300 Northeast 4th Street. (B)
Type: Petition Status: Passed
File created: 5/13/2002 In control: City Plan Board
On agenda: Final action: 5/13/2002
Title: Petition 26WSU-02 CC. (Quasi-Judicial). Request by Cinque Holdings, Inc. for a wellfield protection special use permit with associated development plan review for construction of a building for automotive repair located at 3300 Northeast 4th Street. (B)
Title
Petition 26WSU-02 CC. (Quasi-Judicial). Request by Cinque Holdings, Inc. for a wellfield protection special use permit with associated development plan review for construction of a building for automotive repair located at 3300 Northeast 4th Street. (B)

Explanation
The petition is a request for approval of a Wellfield Special Use Permit and development plan approval for construction of an automotive repair facility at 3300 Northeast 4th Street. The specific tenants of the building are yet to be determined. The proposed site is 2.74 acres, designated Industrial on the City of Gainesville Future Land Use Map and zoned I-1. The proposed development is located in the tertiary zone of the Wellfield Special District and in Zone A of the Transportation Concurrency Exception Area. The proposed site is vacant.

The Plan Board reviewed the Wellfield Special Use Permit requirement and approved the special use permit with the following conditions:

1. Each tenant and or the property shall comply with the Alachua County Hazardous materials management code.
2. There shall be no underground tanks containing hazardous materials as defined by Alachua County.
3. There shall be no underground hydraulic lift systems.
4. Specific GRU approval is required prior to the disposal of hazardous materials to the sanitary sewer.
5. The floor drains/oil water separator systems shall be more clearly identified on the final development plan.
6. The property owner shall be responsible for the maintenance of the common floor drain/oil water separator.
7. Uses that are not auto repair have not been reviewed with regard to the Wellfield Special Use Permit. Therefore, any tenant that is not an automotive repair business will need a separate Wellfield Special Use Permit.

The Plan Board also reviewed the development plan. The development plan proposes construction in three phases with two buildings containing 9000 square feet and one building with 2000 square feet. The...

Click here for full text



© 2014 City of Gainesville, Florida. All right reserved.

CONTACT US
City Departments
Online Contact
200 East University Ave.
Gainesville, FL 32601
352-334-5000