Gainesville Logo
 
File #: 040133    Version: 0 Name: Authorization of Professional Design Services for Drainage Improvements at SE 2nd Avenue Over Rosewood Branch (NB)
Type: Staff Recommendation Status: Passed
File created: 7/12/2004 In control: City Manager
On agenda: Final action: 7/12/2004
Title: Authorization of Professional Design Services for Drainage Improvements at SE 2nd Avenue Over Rosewood Branch (NB)
Title
Authorization of Professional Design Services for Drainage Improvements at SE 2nd Avenue Over Rosewood Branch (NB)
 
Explanation
This project includes professional engineering services for drainage improvements at SE 2nd Avenue over Rosewood Branch.  Stormwater flow has caused erosion of the roadway embankment near the creek.  The proposed design will stabilize erosion of the embankment and the streambed.  A stormwater retrofit facility will also provide water quality treatment for the contributing watershed.
 
Fiscal Note
The total project cost is $44,491 and will be funded by the U.S. Environmental Protection Agency Special Purpose Grant for Revitalizing the Sweetwater Branch.
 
Recommendation
The City Commission authorize the City Manager or designee to issue a purchase order not to exceed $44,491 to Johnson, Mirmiran & Thompson, Inc., based on the scope of work dated June 7, 2004, as allowed under the existing contract for Water Resource Engineering Services.
 



© 2014 City of Gainesville, Florida. All right reserved.

CONTACT US
City Departments
Online Contact
200 East University Ave.
Gainesville, FL 32601
352-334-5000