File #: 070032.    Version: 0 Name: Reimbursement for Oversizing of Wastewater (WW) and Reclaimed Water (RCW) Facilities at Brytan Planned Development (NB)
Type: Staff Recommendation Status: Passed
File created: 5/14/2007 In control: General Manager for Utilities
On agenda: Final action: 5/14/2007
Title: Reimbursement for Oversizing of Wastewater (WW) and Reclaimed Water (RCW) Facilities at Brytan Planned Development (NB) Reimburse the developer of Brytan Planned Development for the oversizing of Wastewater (WW) and Reclaimed Water (RCW) facilities.
Title
Reimbursement for Oversizing of Wastewater (WW) and Reclaimed Water
(RCW) Facilities at Brytan Planned Development (NB)

Reimburse the developer of Brytan Planned Development for the oversizing of Wastewater (WW) and Reclaimed Water (RCW) facilities.
Explanation
Brytan is a mixed use planned development located in the 7500 block of SW Archer Road. A wastewater gravity collection system, pump station and force main must be constructed to provide wastewater service for the project. The pump station and force-main network will connect to an existing 8-inch force main to the west of the project and an existing 24-inch stub out connected to an existing 36-inch force main located in the southern right-of-way of SW Archer Road.
In order to properly serve adjacent undeveloped parcels and minimize the expense associated with multiple lift stations that GRU would have to operate and maintain increased depth of the Brytan gravity collection system is required. For the same reason, GRU is requiring wastewater stubouts to the property line. Additionally, the force main is being oversized at the direction of GRU to increase wastewater system capacity and reliability. The Developer’s Engineer has accommodated this in the development design. The developer’s incremental cost to oversize the force main, deepen the gravity wastewater system and stubout wastewater service, for which reimbursement is being sought, is $300,000.00.
The recommended amount of $300,000.00 includes all design, construction, labor, and materials associated with the WW and RCW system oversizing to satisfactorily complete the work.
Recommendations
The City Commission authorize the General Manager or her designee to negotiate and execute an agreement for reimbursement to Brice Business Group for the oversizing of WW and RCW facilities in an amount not to exceed $300,000.00 subject to approval of the City Attorney as to form and legality.
Fiscal Note
Monies for this project are ...