File #: 070033.    Version: 0 Name: Reimbursement for Oversizing of Wastewater (WW) Facilities at Shands Ambulatory Surgery Center (NB)
Type: Staff Recommendation Status: Passed
File created: 5/14/2007 In control: General Manager for Utilities
On agenda: Final action: 5/14/2007
Title: Reimbursement for Oversizing of Wastewater (WW) Facilities at Shands Ambulatory Surgery Center (NB) Reimburse the developer of Shands Ambulatory Surgery Center for the oversizing of Wastewater (WW) facilities.
Title
Reimbursement for Oversizing of Wastewater (WW) Facilities at Shands Ambulatory Surgery Center (NB)

Reimburse the developer of Shands Ambulatory Surgery Center for the oversizing of Wastewater (WW) facilities.

Explanation
Shands Ambulatory Surgery Center is located at 3480 Hull Road. A privately maintained wastewater pump station and GRU maintained 4-inch force main must be constructed to provide wastewater service for the project. Additionally, a segment of 16-inch force main is being oversized at the direction of GRU to increase wastewater system capacity, reliability and redundancy.
The facilities constructed under this agreement will ultimately be part of improvements to add redundancy and thus improve the reliability of a major wastewater conveyance system. Additionally, it is anticipated this oversizing will serve the future Urban Student Village proposed in this area. The Urban Student Village will require a new master wastewater pump station and force main that will discharge to the SW 34th Street force main. The 16-inch force main is adequately sized to transmit wastewater flow resulting from the development in this area.
The Developer’s Engineer accommodated this in the development design. The developer’s incremental cost to oversize the force main and stubout wastewater service, for which reimbursement is being sought, is $360,000.00.
The recommended amount of $360,000.00 includes all design, construction, labor, and materials associated with the WW system oversizing to satisfactorily complete the work.
Recommendations
The City Commission authorize the General Manager or her designee to negotiate and execute an agreement for reimbursement to the University of Florida Foundation for the oversizing of WW facilities in an amount not to exceed $360,000.00 subject to approval of the City Attorney as to form and legality.
Fiscal Note
Monies for this project are available in the FY 07/08 Water and Wastewater Capital Improvem...