Gainesville Logo
 
File #: 140746.    Version: 1 Name:
Type: Staff Recommendation Status: On Consent Agenda
File created: 2/19/2015 In control: General Manager for Utilities
On agenda: 3/5/2015 Final action:
Title: Annual Contract for Horizontal Directional Drilling (B)
Attachments: 1. 140746 Bid Tab - Directional Drilling 20150305
Title
Annual Contract for Horizontal Directional Drilling (B)

Explanation
GRU’s water, wastewater, and natural gas systems install underground pipe, conduit and cable through a trenchless technology known as horizontal directional drilling. This type of drilling is used when trenching or excavating is not practical at a work site, such as a roadway or sidewalk. Work can be performed at the site to repair or install water, wastewater and natural gas infrastructure equipment with fewer open cuts, reducing repair costs, expediting service restoration and improving public safety. Establishing annual contracts for these services allows GRU departments to have contractors available to perform horizontal directional drilling services as needed to facilitate repairs. Since the primary contractor may not be available to respond to an unanticipated and urgent repair, having a contract with a secondary contractor helps to reduce work delays. The combined annual cost for these services is approximately $750,000.

An Invitation to Bid for this work was sent by Utilities Purchasing to the known companies that perform this type of work and the bid was posted on GRU’s web page. Four bids were received which were evaluated based on pricing, availability and contractor experience. D&D, Inc., a small business, submitted the best bid and is being recommended for award of a contract as the primary contractor. General Underground, LLC, a small minority-owned business, submitted the next best bid and is recommended for award of a secondary contract. A tabulation is attached for reference.

Fiscal Note
Funding for this work is included in GRU’s Capital Improvements budget for FY 2015 and will be requested in future fiscal year budgets.

Recommendation:
The City Commission: 1) authorize the Interim General Manager, or her designee, to execute annual contracts for a three-year period with D&D, Inc. as the primary contractor, and General Underground, LLC as the secondary contrac...

Click here for full text



© 2014 City of Gainesville, Florida. All right reserved.

CONTACT US
City Departments
Online Contact
200 East University Ave.
Gainesville, FL 32601
352-334-5000