File #: 150640.    Version: 1 Name:
Type: Discussion Item Status: Passed
File created: 12/16/2015 In control: City Manager
On agenda: 3/17/2016 Final action: 3/17/2016
Title: Authorization for Construction of the Tumblin Creek Sediment Facility (B) This item is a request for the City Commission to approve the Guaranteed Maximum Price in the amount of $1,773,018.10 for the construction of the Tumblin Creek Sediment Facility with The Brentwood Company, Inc.
Attachments: 1. 150640A_Tumblin Creek GMP_20160317.pdf, 2. 150640B_Tumblin Creek GMP Schedule_20160317.pdf, 3. 150640C_Tumblin Creek Exhibits for GMP_20160317.pdf, 4. 150640D_Tumblin Creek Project Timeline Summary_20160317.pdf, 5. 150640E_Tumblin Creek Presentation_20160317.pdf
Title
Authorization for Construction of the Tumblin Creek Sediment Facility (B)

This item is a request for the City Commission to approve the Guaranteed Maximum Price in the amount of $1,773,018.10 for the construction of the Tumblin Creek Sediment Facility with The Brentwood Company, Inc.

Explanation
The Tumblin Creek Sediment Facility (TCSF) was identified as a project in the Tumblin Creek Watershed Management Plan. The location of the project is east of SW 13th Street with access being provided through the property located at 1880 SW 13th Street. It was identified as a facility to collect sediment and trash within Tumblin Creek prior to discharging into Bivens Arm and also as a means to re-hydrate approximately 6 acres of wetlands located immediately to the north of this section of Tumblin Creek. The project was also identified as a possible Water Quality (WQ) credit.

The original budget for the project was $1,250,000 and was funded from the Stormwater Management Utility. Additional funding was received from Florida Department of Transportation (FDOT) in the amount of $190,785 and the Florida Department of Environmental Protection (FDEP) in the amount of $393,357. The current total budget for the project is $1,834,142.

Jones Edmunds was selected as the design firm. The planning, design, and land acquisition phases based on the above items utilized approximately $500,000 of the budget. This results in approximately $1,334,142 funds available for construction. All of the pre-construction costs are from the Stormwater Management Utility (SMU) funds; bring the remaining available SMU funding to approximately $750,000.

The Tumblin Creek Regional Stormwater Treatment Facility project includes the removal of a spoil berm to rehydrate wetlands, as well as sediment and trash trap. Due to the proximity of the sheet pile and trash trap to GRU's 24-inch gravity sewer main, it was determined that the gravity main should be sliplined to provide additional structu...