Gainesville Logo
 
File #: 170140.    Version: 1 Name:
Type: Staff Recommendation Status: Passed
File created: 6/13/2017 In control: City Manager
On agenda: 7/6/2017 Final action: 7/6/2017
Title: Selection of Shade Structures, Inc. for the design, permitting, fabrication and installation of shade structures (B) This item requests approval of the installation of shade structures at eight (8) Parks, Recreation and Cultural Affairs sites.
Attachments: 1. 170140A_RFP_Shade Structures_20170706.pdf, 2. 170140B_Draft Contract_Shade Structures_20170706.pdf, 3. 170140C_Shade Systems Inc. Full Proposal-RECP-170039-DM_20170706.pdf, 4. 170140D_RFP Shade Structures_Recommendation of Award-170039-DM_20170706.pdf, 5. 170140E_WSPP 2017 Expense Schedule_20170706.pdf, 6. 170140F_RFP SHADE STRUCTURES BID TAB_20170706.pdf
Title

Selection of Shade Structures, Inc. for the design, permitting, fabrication and installation of shade structures (B)

This item requests approval of the installation of shade structures at eight (8) Parks, Recreation and Cultural Affairs sites.

Explanation

The Department of Parks, Recreation and Cultural Affairs issued a Request for Proposals for the design, permitting, fabrication and installation of shade structures at several City facilities. Those facilities are Roper Park, Fred Cone Park, Cedar Grove Park, Porters Community Center, Rosa B. Williams Center, MLK Center, Cofrin Nature Park and the Ironwood Golf Course driving range. The Department of Parks, Recreation and Cultural Affairs (PRCA) engaged the community and key stakeholders and developed the PRCA Vision 2020 Master Plan that addressed the current state of all City parks and facilities identifying serious needs for renovations and improvements. This Master Plan was adopted by the City Commission in November 2012. In 2016 the Citizens of Alachua County passed an eight-year half cent sales tax which resulted in generating funds to pay for a large portion of the projects and improvements identified in the PRCA Master Plan.  In April 2017 the City Commission approved the expenditure of a portion of those funds for projects, including the shade structures for City parks and facilities. 

There is a need for shade structures in our parks to protect citizens from the harmful effects of sun exposure, allowing them to play and enjoy City parks and facilities longer. The bright Florida sun damages the park equipment; fades color, softens the plastic, breaks down protective coating, and makes equipment very hot to the touch, which can burn small children.  The scope of service requires that a minimum of 70% of the playground area must be covered by the structure. The anticipated completion date at all eight (8) locations is October 31, 2017.

Purchasing received only two bids for the project...

Click here for full text



© 2014 City of Gainesville, Florida. All right reserved.

CONTACT US
City Departments
Online Contact
200 East University Ave.
Gainesville, FL 32601
352-334-5000