Gainesville Logo
 
File #: 191122.    Version: 1 Name: Resolution and Quit Claim Deed Request for Florida Department of Transportation from the City of Gainesville (B)
Type: Resolution Status: Adopted
File created: 3/11/2020 In control: City Commission
On agenda: 4/16/2020 Final action: 4/16/2020
Title: Resolution and Quit Claim Deed Request for Florida Department of Transportation from the City of Gainesville (B) This item involves the request for adoption of a Resolution and grant of a Quit Claim Deed from the City of Gainesville to the Florida Department of Transportation (FDOT).
Attachments: 1. 191122A_Backup-QCD_20200402, 2. 191122B_FDOT Resolution-Deed_20200402, 3. 191122C_Quit Claim Deed to FDOT_20200402, 4. 191122_Resolution_20200416.pdf

Title

Resolution and Quit Claim Deed Request for Florida Department of Transportation from the City of Gainesville (B)

 

This item involves the request for adoption of a Resolution and grant of a Quit Claim Deed from the City of Gainesville to the Florida Department of Transportation (FDOT).

 

Explanation

The Florida Department of Transportation (FDOT) is constructing a new two-lane roadway (The Southwest 62nd Boulevard Arterial Connector) from Southwest 43rd Street/Clark Butler Boulevard to Southwest 52nd Street. The design includes intersection improvements at Southwest 43rd Street, stormwater management facilities, a new 330-ft bridge over Hogtown Creek and a multiuse path along the East side of the proposed roadway. The project will include lighting and landscaping near the proposed stormwater ponds and along the roadway.

 

The Resolution is for a Quit Claim Deed conveying the City’s interest in a Drainage Easement between the City of Gainesville and S. Clark Butler Properties Land Trust, dated December 10, 1998, recorded in Official Records Book 4380, Page 1074, of the Public Records of Alachua County, Florida. The conveyance is for approximately 6,932 square feet. The conveyance is identified as item 100A on sheet 3 of the attached maps.

 

Fiscal Note

There is no fiscal impact associated with this request.

 

Recommendation

The City Commission: 1) adopt the Resolution approving the Quit Claim Deed to the Florida Department of Transportation; and 2) authorize the Mayor to execute and the Clerk or designee to attest the Quit Claim Deed to the Florida Department of Transportation, subject to the approval of the City Attorney or designee as to form and legality.

 




© 2014 City of Gainesville, Florida. All right reserved.

CONTACT US
City Departments
Online Contact
200 East University Ave.
Gainesville, FL 32601
352-334-5000