Gainesville Logo
 
File #: 160012.    Version: 1 Name:
Type: Staff Recommendation Status: Passed
File created: 3/18/2016 In control: City Manager
On agenda: 7/21/2016 Final action: 7/21/2016
Title: Agreement for Purchase of Easement and Stormwater Improvements (B) This item is a request for the City Commission to approve an agreement with Southpark Investment Group, LLC (SIG) for the construction of the second portion of the Innovation Square Storm Pipe Upgrade project.
Attachments: 1. 160012A_EasementAgreement_20160721.pdf, 2. 160012B_InnovationSquarePipeUpgrade_20160721.pdf, 3. 160012C_InnovationSquarePipeExtension_CityCommission_20160721.pdf, 4. 160012_Quit-Claim Deed_20160721.pdf
Title
Agreement for Purchase of Easement and Stormwater Improvements (B)

This item is a request for the City Commission to approve an agreement with Southpark Investment Group, LLC (SIG) for the construction of the second portion of the Innovation Square Storm Pipe Upgrade project.

Explanation
The stormwater conveyance system in and around Innovation Square was installed over time and in a manner that proved to be insufficient to prevent flooding upstream. The pipe network from SW 2nd Avenue to the headwall in the 900 block of SW 5th Avenue was identified in the Tumblin Creek Watershed Management Plan as needing to be upgraded in certain sections to remove constriction points in order to alleviate upstream flooding conditions.

The original project routed a new pipe system around the former Alachua General Hospital site west in SW 2nd Avenue, south in SW 10th Street, and east in SW 5th Avenue. With the master planning associated with the Innovation Square and the demolition of Alachua General Hospital, the project was modified to be a straight corridor to reduce the pipe lengths, roadway impacts, and costs.

The first portion of the 72” storm pipe upgrade in Innovation Square was completed in 2014 as part of the construction of SW 9th Street. This project terminated the 72 inch pipe on the north side of SW 4th Avenue.This project will extend the pipe from its current location on the north side of SW 4th Avenue to the headwall on the south side of SW 5th Avenue, crossing both SW 4th Avenue and SW 5th Avenue.

Southpark Investment Group (SIG) is in the process of redeveloping the western portion of a parcel located between SW 4th Avenue and SW 5th Avenue through which the existing 72 inch pipe is located. SIG and Public Works have worked together to include the installation of a new City’s 72 inch pipe extension concurrent with SIG’s site work.

This project will also include the relocation and upgrade of the existing headwall to which is currently located ...

Click here for full text



© 2014 City of Gainesville, Florida. All right reserved.

CONTACT US
City Departments
Online Contact
200 East University Ave.
Gainesville, FL 32601
352-334-5000